| Premises 4 | |||||||||||||||
| Once we allowed for grading the earth back away from the water main this didnt leave much room along the front, so time for a re-think and revised planning application. | |||||||||||||||
| Weve changed the entrance position, and returned the earth levels to the pre-excavation point and levelled this off. | |||||||||||||||
![]() |
|||||||||||||||
| Entrance and visibility splay created and gates fitted avoiding water main (so far!) |
|||||||||||||||
![]() |
|||||||||||||||
![]() |
|||||||||||||||
| Hardcore to prepare entrance and give working surface on site | |||||||||||||||
![]() |
|||||||||||||||
| Land drains in and hardcore to working surface | |||||||||||||||
| Walls marked for door and window positions ready for the guys with the diamond wire cutting | |||||||||||||||
![]() |
|||||||||||||||