“Internal work started with a vengeance. Thought we’d never get here!


Drylining with 100mm insulation board then 15mm plasterboard onto metal studwork.

Partitioning for WC area
Ceiling grid going up for suspended ceiling,
with 150mm insulation above

Thanks to Brian & Karl of BKS Construction for their excellent work. They’ll be back later to fit final trim/doorframes etc.

All wiring handled by David Fletcher – including unravelling my instructions!
Mini Sewerage Treatment plant being installed
Power now connected and wiring complete.
Tarmac planings rolled down to give useable driving surface. Thanks again to Phil Vanstone